Church 301-662-1464 School 301-662-6783 office@calvaryumc.org

Pastor Ponderings

The Trustees have started a renovation project on the ladies’ restroom on the main level.  The pick tile and flowered wallpaper have been removed and permanently retired.  After the dust settles and the caulk dries, there will be a new, fresh and appealing restroom for the women to use just outside the library.  In the meantime, the Men’s room near the library will be turned into a temporary Ladies’ room.  Upstairs, the small restroom outside the parlor will also be renovated and updated.

The John Wesley Room across from the chapel is also getting a makeover.  The smaller, outer room will be opened up and the cabinets removed.  The larger room behind this will get a new ceiling, better lighting and window treatments.  The plan is for this to become a classroom or lounge with some sofas and chairs.  This will make a nice space for counseling, small groups, for families to gather before a funeral or wedding attendants before the ceremony.  These projects are intended to continue to make the best use of our facilities.  Incidentally, the presence of the large dumpster in the church parking lot allows the church to clean out some of the materials and accumulated items that are no longer needed.

See you in church,

Pastor Steve